
EXTERIOR
Full Exterior Restoration
Pasadena, CA November 2024 6 Weeks 32 Units
Before

After

The Challenge
A 32-unit condominium complex had widespread stucco cracking, failed sealant joints at windows and doors, and outdated metal railings that no longer met current building code for height and load requirements.
Our Solution
We performed a full exterior restoration including stucco crack repair and refinishing, replacement of all window and door sealants, and installation of new code-compliant glass railing systems on all balconies and stairways. The building received a complete repaint with commercial-grade elastomeric coating.
Results
- Complete exterior transformation in 6 weeks
- All railings now meet current California building code
- HOA reported 30% increase in prospective buyer inquiries
- 5-year workmanship warranty on all finishes
Project Gallery


